New Office Stage Build – Surrey Hills

Type of Work:
Framing and installation of yellow tongue flooring

What was done?
We started by installing wall fixings around the entire perimeter, securing wall plates directly into the existing structure. Joists were then installed at precise, level heights to create a solid and even base. Once the framework was complete and structurally sound, yellow tongue flooring sheets were laid,each one cut to fit the specific dimensions of the space.

To finish the project, a step was framed and floored to match the rest of the surface, ensuring both accessibility and a seamless finish across the entire area.

What was the client’s goal?
To build a strong, level office stage that would provide long-term durability and a clean, professional finish suitable for everyday use.

Previous
Previous

Marrickville Pergola

Next
Next

Composite Decking – Blakehurst